Fasten a cedar starter strip the same thickness as the top of the beveled siding all around the house using a tape measure and level to set it level along the bottom of the wall.
Bottom nailling strip for wood siding shingles.
Siding nail face nailing face nailing is applicable where dictated by building code in high wind areas and when fastening is to osb or equivalent sheathing without penetrating into studs.
Wood siding shingles and shakes.
Starter strip should be 4 5 in.
Click to enlarge any image this article series discussion includes wood shingle siding underlayment requirements.
When nailing shingles proper penetration into the roof deck is essential to ensure the nail and shingle remain secure.
For all owens corning shingles roofing nails should penetrate into the wood deck by a minimum of inch or completely through the roof deck by a minimum of 1 8 inch.
Put the bottom step flashing on the starter course then bend the bottom of the step flashing out about 1 to 1 away from the wall.
Thick and installed to hang below shim approximately 1 in.
It is used behind siding and trim pieces to protect the backerboard.
The indentations profile cut outs of the bottom edge of the first course of siding must overlap.
Add felt if needed before nailing the new wood on and prime the new wood on all four sides before installing it.
The difference between a good shingle and a great shingle is having surenail technology only available from owens corning on duration series shingles.
Apply siding to wall assembly directly to wood structural panel sheathing.
This strip of wood or metal is attached to brick stucco or old siding.
Install the kickout flashing underneath the first shingle photo 1.
You do have to trim the top starter course shingle with a triangle shaped cut to allow this.
Wood shingle siding nailing details.
Patented surenail technology features a wide highly visible engineered fabric strip in the nailing area for a consistent quality installation and the unique product design provides.
The top of the step flashing is still under the siding or plaster.
These strips will receive the nails from the new siding.
This is a decorative feature that covers the top of the siding where it connects to the soffit.
Starting from left to right level and install the siding so the bottom edge is no more than 1 2 inch below the starter strip.
Adapted paraphrased with permission from best practices guide to residential construction.